Site progress concentrated on securing floor track channels to subflooring and assembling light-gauge metal stud partitions near interior stairwells.
Carpenters positioned metal floor tracks along pre-marked reference lines and used power drivers to anchor the channels directly into the subfloor decking. Framers then fitted vertical steel studs into the track system, plumbing the assemblies against adjacent exposed brick walls and securing structural connections surrounding interior floor openings.