Construction Update
All Updates

First Floor Completely Opened Up

June 4, 2026

The first floor has been stripped entirely to its raw structure, with all partition walls, old wiring, and even the ceilings completely removed. This total-gut process is being applied across every single level, clearing away decades of old material to leave us with nothing but a clean, open skeleton.

Next stop: Bringing this total teardown down into the lowest levels.