Construction Update
All Updates

Interior Partition Framing and Horizontal Bridging Installation

August 6, 2026

Site progress focused on advancing interior metal stud wall assemblies, installing continuous horizontal bridging channels, and custom-cutting steel components.

Carpenters positioned and secured vertical light-gauge steel studs into floor tracks while threading horizontal bridging through knockouts to prevent stud rotation and provide lateral stability. Framers utilized benchtop chop saws on site to trim metal channels and track profiles to precise lengths for wall intersections and structural clearances.