
Site operations focused on bearing joist pocket repair along structural brick walls, installing steel floor joist supports, and constructing interior metal partition wall assemblies.
Workers applied mortar grout around cold-formed steel floor joist ends where they bed into brick wall pockets along the perimeter. Concurrently, framing crews assembled vertical metal studs, secured track connections overhead near joist bays, and positioned timber components for site staging and partition structures.
Photos




No items found.