Site progress focused on structural masonry repair, anchor bolt grouting, and continued interior metal stud partition framing across active floor levels.
Tradespeople mixed and applied high-strength mortar/topping mix along existing exposed brick walls to pack voids and securely bed threaded structural anchor bolts. Simultaneously, carpentry crews continued laying out, cutting, and securing light-gauge metal tracks and vertical studs for interior wall partitions, while tradespeople assisted in positioning dense drywall panels into place.