
Kicking off July, the site saw heavy structural work focused on reinforcing existing timber floor joists. The crew spent the day "sistering"—bolting fresh, dimensional lumber directly alongside original floor beams to fortify the subfloor structure and increase load capacity.
From hauling structural materials up the front stoop to precision-drilling heavy through-bolts through sistered pairs, the team ensured the framing meets modern engineering standards while preserving the building's historical bones.
Photos



No items found.