Construction Update
All Updates

Structural Floor Framing, Laser Alignment, and Sub-Level Clearing

August 19, 2026

Work centered on securing overhead cold-formed steel floor joists, utilizing laser alignment tools for precise leveling, and clearing masonry debris at the cellar level.

Framers on ladders used power drivers to fasten metal joist bridging and rim tracks beneath the decked subfloor. Tradespeople projected green laser levels across the floor assemblies to verify structural alignment against existing brick perimeter walls. Below, the excavated cellar floor was cleared of soil, with reclaimed brick salvaged and neatly stacked along the stone foundation.