Work focused on excavating basement soil, transferring heavy debris using plastic bins and hand trucks, and hauling materials off site via a dump truck.
Laborers hand-shoveled earth and rubble at the sub-level floor, filling five-gallon buckets to transport materials up to the main level. Bins were loaded onto hand trucks to cross the plywood subfloor, while workers on the upper floor cleared debris around structural floor openings. Outside, excavated concrete, masonry, and bagged waste were loaded directly into a commercial dump truck for disposal.